Project contents
← Self-balancing robot
Progress update, 6 May 2026
A short bullet-point summary of project progress up to 6 May 2026.
Updates are bullet-point summaries generated with AI from my commits and build notes, then checked by me. Project articles and learning notes are written by me.
- Added a CMake build for the PC targets, the simulator and the unit tests, using C++17 with Google Test fetched at configure time. The STM32 firmware still built in Keil.
- Added a Docker build environment and a VS Code devcontainer on the same Dockerfile.
- Registered each test case with CTest through
gtest_discover_tests.