Progress update, 13 Jun 2026
A short bullet-point summary of project progress up to 13 Jun 2026.
Updates are bullet-point summaries generated with AI from my commits and build notes, then checked by me. Project articles and learning notes are written by me.
- Got the first green firmware build from GCC and CMake: 36.2 KB of the 256K flash (14%) and 2.5 KB of RAM (5%). It had not been flashed yet.
- Added a
_writeretarget soprintfreaches the UART under newlib. - Added a firmware build job to CI alongside the host tests, and both passed.