Progress update, 24 Sept 2026
← Self-balancing robot

· Update · AI summary

Progress update, 24 Sept 2026

A short bullet-point summary of project progress up to 24 Sept 2026.

Updates are bullet-point summaries generated with AI from my commits and build notes, then checked by me. Project articles and learning notes are written by me.

  • Enabled the velocity integral at Ki 35 with a limit of 200. Over a 21.74 s capture the angle stayed between -8.39° and +8.42°, the peak motor command was 1040, and the car recovered from pushes.
  • A weaker Ki=4 trial had let the car creep backward with the integral pinned at its limit.
  • Verified that a stale sensor stops an armed car: with a fault injected, it disarmed exactly 25 ms after the last fresh sample and stayed stopped for 17.2 s.